Your Shopping Cart is empty.


Download sample
File Details
Published: 2026-06-26 07:54:38.491679 Category: Industry Type: Vector Model release: No
Share
       

Data Center Construction: Server Racks, Cooling Systems, and Crane in Line Art

Contributor: Dodo
ID : 2073849427

TitleFilesize
Vector5184x2893


Buy on Adobe Stock

Keywords
datum, center, server, rack, construction, cooling, system, crane, industrial, technology, infrastructure, digital, network, hardware, building, engineering, modern, abstract, schematic, blueprint, design, electrical, equipment, innovation, processing, storage, utility, energy, architecture, clean, white, monochrome, vignetting, outline, drawing, isometric, perspective, development, information technology, computing, project, site, industry, mechanical, ventilation, power, connection